Industrial boiler manufacturing · Kurali, Punjab
1 MW supporting cleaner boiler manufacturing
Delivered for Cheema Boilers Ltd.THE PROJECT
Solar at the scale of boiler manufacturing.
Cheema Boilers’ Kurali facility uses a 1 MW rooftop solar installation to address the electricity needs and environmental impact of boiler manufacturing.
FROM NEED TO OUTCOME
The need. The solution.
The difference.
Manage an energy-intensive operation.
Electricity is a significant manufacturing overhead. Cheema Boilers sought to reduce grid dependence and bring cleaner generation into its industrial operations.
A megawatt-scale rooftop system.
Ekam Energy engineered and executed the 1 MW installation using Tata Power Solar modules, with ongoing monitoring, an annual maintenance contract and performance tracking.
Track performance beyond handover.
The plant is expected to generate 13–14 lakh units annually, helping control purchased electricity costs while supporting lower-carbon production. Continued monitoring and maintenance support long-term operating value.
HOW EKAM DELIVERS
One accountable partner.
Every project stage.
Site, load and feasibility review
System design and generation planning
Procurement and quality-led installation
Testing, approvals and handover
Monitoring and long-term service
Plan for operation, not just installation.
A large industrial solar investment needs a clear plan for monitoring and maintenance. Ongoing performance review matters alongside the initial capacity and equipment selection.
Generation and CO₂ figures are estimates, not guaranteed results. Actual output varies with weather, site conditions and system operation. One electricity unit equals one kilowatt-hour (kWh).